FC Cincinnati Training Facility

This project was the new build of the FC Cincinnati Mercy Health Training Center. BCL provided the IT, wireless, AV, and Security Design for the building in conjunction with FC Cincinnati. BCL discussed with the owner how to meet the needs of the spaces for staff and athletes.

The facility includes three full-size lighted soccer fields – including two stabilized natural grass surfaces and one synthetic turf surface – and a goalkeeper-specific training area.

Location: Milford, OH

Year: 2020

Size: 24-Acre

Cost: $30 Million